Menu

Samir TIRICHINE

DUBAI

En résumé

NEVER SEND A FROG TO RECRUIT A LION OR CONVEY A RABBIT TO BE TRAINED AT THE EAGLES SCHOOL:THROUGH THE LAW OF ATTRACTION, SEND THE "BEST" LEADERS TO RECRUIT "GOOD" LEADERS ."WE ATTRACT SUCCESS BY THE PERSON WE BECOME”.

Mes compétences :
manage the efficient operation
interpersonal skills
handover process management
employee performance management
communication Skills
Procurement
Oracle
Microsoft Office
Description Administration
Corel Draw Suite
Continuous monitoring
Civil Engineering
Autocad
Assembly Plants

Entreprises

  • AL JABER TRANSPORT & GENERAL - Project Engineer

    2011 - maintenant AL JABER TRANSPORT & GENERAL CONTRACTING, AUH, (
    Projects Handled:

    Project Petroleum Institute Staffaccommodation
    Client ADNOC
    Consultant Hill international
    Project Cost AED 1.5 billions
    Project Description Construction of 2 towers G+9 and G+5 in addition to 10 villas

    Project Al Fallah Community 2080 Villas
    Client Al Dar
    Consultant Atkins
    Project Cost AED 2.7 billions
  • Al jaber group - Senior Project Engineer

    2011 - maintenant Analyzing and resolving field construction issues.
     Prepare, review and distribute RFIs. Maintain RFI Log.
     Maintain job Rental Authorization Log.
     Maintain job files and as-builts.
     Develop and maintain schedule with Superintendent input.
     Maintain thorough understanding of contract documents and subcontracts.
     Prepare meeting minutes for all job meetings.
     Complete required tasks daily: Timecards, Purchase Orders, Work Orders, RCC Daily Paperwork
    Packet and collecting Subcontractor Daily Job Reports.
     Weekly project photos.
     Inspect/verify material deliveries.
     Manage project closeout and obtain all warranties required for final acceptance.
     Maintain punch list with Superintendent.
     Ensure company procedures and standards are maintained.
    Other duties assigned.
  • System construct - Project Engineer

    2010 - 2011 Analyzing and resolving field construction issues.
     Prepare, review and distribute RFIs. Maintain RFI Log.
     Maintain job Rental Authorization Log.
     Maintain job files and as-builts.
     Develop and maintain schedule with Superintendent input.
     Maintain thorough understanding of contract documents and subcontracts.
     Prepare meeting minutes for all job meetings.
     Complete required tasks daily: Timecards, Purchase Orders, Work Orders, RCC Daily Paperwork
    Packet and collecting Subcontractor Daily Job Reports.
     Weekly project photos.
     Inspect/verify material deliveries.
     Manage project closeout and obtain all warranties required for final acceptance.
     Maintain punch list with Superintendent.
     Ensure company procedures and standards are maintained.
    Other duties assigned.
  • M/S SYSTEM CONSTRUCT - Project Engineer

    2010 - 2011 Projects Handled:

    Project Housing Complex Staff Accommodation And External Works
    Client Abou Dhabi National Oil Company
    Consultant Dorsh
    Project Cost AED 460 Million
  • Great Earth Building Construction - Senior Site Engineer

    2007 - 2010 Receive and review drawings and specifications, identify queries and seek resolution
    * Ensure setting out and measuring equipment is checked, controlled and protected and suitable for intended use
    * Liaise with Foreman and set out the works as shown on drawings to meet day to day requirements
    * Check deliveries for conformance to specification
    * Check critical elements of work during construction and on completion
    * Identify defective materials and workmanship and ensure effective corrective action is taken
    * Provide accurate records and reports, daily and weekly as required
    * Co-operate with others involved in construction operations including obtaining approval from client representatives when specified
    * Work in accordance with Company procedures
    * Prepare Method Statements, Quality Plans and the like as and when required.
  • Probat Construction - Project Engineer

    2003 - 2007 1. Supervision of site works for Tanks, pipe sleepers, buildings and support facilities.
    2. Prepare with the surveyor all survey layouts and implementing drawings.
    3. Coordination between Engineering design company and civil subcontractors.
    4. Prepare technical drawing and plans and made an adjustment and changes to a variety of detailed drawings as necessary.
    5. Establish and maintain the schedule for all Subcontractors civil work.
    6. Maintenance and submittal of progress tracking report for civil works based on the tangible quantities for scope of work.
    7. Coordination of daily internal meeting and weekly client meeting for coordination, quality and progress.
  • PROBAT - Project Engineer

    2003 - 2007 Projects Handled:

    Project DjnanneKouba Residence
    Project Three towers G+14, Mall, Piscine, Administration
    Description

    Project Landskipe City

    Project 40 Villas Chorfa

    Project Mini stadium city Kouba

    Project Buildings G+4
  • Beau engineering - Site Engineer

    1995 - 2002
  • BEAU ENGIEERING - Site Inspector

    1995 - 2002 To inspect and record the construction works carried out by contractor on site and resolve the site generated quaries by co-ordinating with Asst. Resident Engineer.
    • To ensure performance of the work in strict accordance with the drawings and specification.
    • Supervision and Inspection of `additional works’ and `out of scope works’ carried out by contractor.
    • Process the joint measurement forms and maintain the records of their status.
    • Maintain records of completed works for interim and final payment and as-built plans.
    • Make special notes and document the contractors activities that may lead to claims.
    • Be fair and firm in dealings with the contractor. Consider the alternatives and consequences carefully before making decisions.
    • Check temperature, compaction, joints and surface of asphalt
    • Check all form works, reinforcement etc before concrete pouring
    • Co-ordinate and co-operate with Contractors site Foreman for all the activities.
    • Adhere to safe working methods and report to ARE for any accidents on site.
    • Maintain a detailed diary of the day’s work activities, issues, work approved or rejected, hours of operation, labour and equipment used etc, and sign at the end of each day.
    • Coordinate with the laboratory technician and arrange for sampling and testing of satisfactorily completed work and quality assurance testing of suspect materials.
    • Checking the `Day work records’ submitted by contractor
    • Supervision and Inspection of all construction activities carried out by contractor on site.
    • Maintaining records of site resources, daily progress of work, inspections, construction and workshop drawings, method statements and ITPs (Inspector Testing Plans). Making special notes and document the contract activities that may lead to claims.
    • Drafting site instructions for any required variations from, or additions to, the contract documents.
    • Report questionable methods of operations by the contractor to the Engineer.

Formations

  • Bajdi Mokhtar University (Annaba)

    Annaba 1989 - 1995 Bachelor's Degree

    Algerian Official High School Certificate.

Réseau

Annuaire des membres :