15 years’ experience of the management of piping teams (Engineering & Construction); organization and coordination of the activities among different operating centers (Paris, Doha, Chennai, Abu Dhabi ) and field (Qatar, New Caledonia, Russian Federation) in order to perform the work with respect of HSE, cost, planning and contract requirements.

Mes compétences :
Microsoft Project
PIPING
Project Engineer
RAS

Entreprises

  • Technip - Area Superintendent

    Paris 2017 - 2019 Area Superintendent / Deputy Construction Manager - Rafinerie La Mede TOTAL
  • Technip - Piping Superintendent

    Paris 2014 - 2017 Piping Superintendent within YAMAL LNG PROJECT.
    Piping Superintendent in charge of piping activities (Spooling, Prefabrication, Test Pack ....) on EPC contract related to YAMAL LNG PROJECT ( / Total), USD 7 billion contract for 3 LNG Trains, Utilties, Interconnectings ....
  • Technip - Piping Superintendent

    Paris 2012 - 2014 Piping Superintendent PMP Project, Technip, Ras Laffan, QATAR
    Piping Superintendent in charge of the green field piping activities on EPC contract related to PMP (Qatar petroleum / Exxon), USD 1 billion contract for AGR/SRU with associated off-sites.

  • Technip - Area Lead Engineer

    Paris 2011 - 2012 Area Lead Construction Engineer in charge of the construction of Air Compressor Unit, O2/N2 unit, three substations plus the relevant electrical rooms and miscellaneous civil & structure object (Pipe rack, Culvert ...) within Koniambo Pyro metallurgical mine plant (Xstrata Nickel), USD 5.8 Billion

  • Technip - Lead Piping Engineer

    Paris 2005 - 2011 December 2011 – May 2011 Lead Piping Engineer SHTOKMAN project, Technip Office, La defense, FRANCE
    Lead Piping Engineer in charge of the Front End Engineering of onshore proposal (SHTOKMAN/Gasprom/Total/ StatoilHydro) constituted of two very large trains of LNG with associated utilities, Off-sites. All the units of the LNG train were modules. Home office activities executed in Technip Paris office.

    May 2010 – November 2011 Lead Piping Engineer BARZAN project, Technip Office, La defense, FRANCE
    Lead Piping Engineer on Barzan onshore proposal, (Qatar petroleum / Exxon-Mobil), Quotation related to EPC contract of two very large trains of gas treatment with associated utilities, off-sites. Home office activities executed in Technip Abu Dhabi, Technip New Delhi’s and Paris offices.

    December 2007 – May 2010 Lead Field Piping Engineer, QCS project, Technip, Ras Laffan QATAR
    Lead field Piping Engineer on Qatargas III and IV Project, (Qatar Petroleum / Exxon-Mobil), USD 3.5 Billion EPC contract of two additional very large LNG trains which will provide an additional 15.6 MMTPA of LNG (FOB Ras Laffan), with associated utilities, off-sites and off-plots.

    February 2005- December 2007 Piping Engineer, QGX project, Technip, La defense, FRANCE
    Qatargas II Project, (Qatar Petroleum / Exxon-Mobil), USD 4 Billion EPC contract of two additional very large LNG trains which will provide an additional 15.6 MMTPA of LNG (FOB Ras Laffan), with associated utilities, off-sites and off-plots.