Akli AMOUCHI
Construction supervisor (civil - structural engineer & 48 saharian wellheads lin
Projects Tracks Records (Abstract Summary ) :
Sonatrach Total Repsol international JV TFT GAS fields Algeria
TFT GAS fields upgrade “Boosting”Project2008-2009 QA/QC , HSE and Progress follow up of civil & structural & buildings works
Sonatrach-BP Exploration (KCA Deutag Drilling RIG Platform) site CAMP Facilities (2007)
earthworks (Bulldozer sand dune access road openings , levelling compacting Tuff-Limestone roads , sceptic pits...)
site camp access roads preparation (earthworks , fencing ,autonom sceptic pits , ) site preparation , mobilization works
special drilling RIG Steel Structure Reinforced Concrete foundation ... .
Sonatrach-BHP JV (LNG GAS) Head-Wells Facilities (2001-2003)
(Galvanised Fences , Inox instrumentation Piping , Photovoltaic Solar Panels , LNG Pipelines cathodic protection etc.) , Optical Fiber digital DATA cabling ,
Sonatrach BHP JV (LNG GAS) CPF Trains & Facilities (2001-2002)
Team Leadership of +45 workers (Masons, Painters, Welders, Scaffolders, Fireproofers )
Coordination (Site, Laboratory, Subcontractors, Client ,Vendors, Warehouse….).
Sonatrach-Halliburton(HESS) Flared GAS Reinjection stations (2005)
MBT BASF, SIKA high performance composite epoxy cement grouting of heavy mechanical (Rotating) equipments
Sonelgaz 8X25MW Gas powered electrical production plant (2006)
Granitex composite cement grouting of heavy mechanical (Rotating) equipments
Regional Waste Water Epuration stations , transfer channel , Lagoons (sceptic pits) (2007)
geotechnical (Access Roads Subgrade) and composite cement concrete site QA-QC testing & inspection with use of digital (stifness and compaction gauge) and manual (slump gauge) measurement apparatus
Participation Level (Role)
Construction Supervisor (TEAM LEADER )
Minor : Structural Concrete QC inspector
(compliance engineering to client specifications and
ACI , ASTM , BS , API codes)
2001 - 2007Projects Tracks Records (Abstract Summary ) :
Sonatrach-BP Exploration (KCA Deutag Drilling RIG Platform) site CAMP Facilities (2007)
earthworks (Bulldozer sand dune access road openings , levelling compacting Tuff-Limestone roads , sceptic pits...)
site camp access roads preparation (earthworks , fencing ,autonom sceptic pits , ) site preparation , mobilization works
special drilling RIG Steel Structure Reinforced Concrete foundation ... .
Sonatrach-BHP JV (LNG GAS) Head-Wells Facilities (2001-2003)
(Galvanised Fences , Inox instrumentation Piping , Photovoltaic Solar Panels , LNG Pipelines cathodic protection etc.) , Optical Fiber digital DATA cabling ,
Sonatrach BHP JV (LNG GAS) CPF Trains & Facilities (2001-2002)
Team Leadership of +45 workers (Masons, Painters, Welders, Scaffolders, Fireproofers )
Coordination (Site, Laboratory, Subcontractors, Client ,Vendors, Warehouse….).
Sonatrach-Halliburton(HESS) Flared GAS Reinjection stations (2005)
MBT BASF, SIKA high performance composite epoxy cement grouting of heavy mechanical (Rotating) equipments
Sonelgaz 8X25MW Gas powered electrical production plant (2006)
Granitex composite cement grouting of heavy mechanical (Rotating) equipments
Regional Waste Water Epuration stations , transfer channel , Lagoons (sceptic pits) (2007)
geotechnical (Access Roads Subgrade) and composite cement concrete site QA-QC testing & inspection with use of digital (stifness and compaction gauge) and manual (slump gauge) measurement apparatus
Participation Level (Role)
Construction Supervisor (TEAM LEADER )
Minor : Structural Concrete QC inspector
(compliance engineering to client specifications and
ACI , ASTM , BS , API codes)
2001 - 20062001 to 2006
Civil QC Supervisor / Civil Field Engineer
Ohanet, (Southern of Algeria) CTU contractors ( www.etterkib.com )NG Gas plant & wells project For BHP/Sonatrach
Power plant project for sonelgaz group
Site & mechanical & electrical & structural installations : like Turbines , generators , pumps , Pipeline , pipe rack , optical fiber )
• Leadership of +45 workers (Masons, Painters, Welders, Scaffolders, Fireproofers )
• Planned , scheduled and organized works ; Tested materials quality in laboratory.
• Identified , corrected and prevented site problems :
Quality, Planning, Human, Safety…
• Coordination (Site, Laboratory, Subcontractors, Client ,Vendors, Warehouse….).
• Respected the ABB specifications, quality & Safety plans and planning (-10%).
Received an ABB Petrofac international special recognition
2001 - 20012001 to 2001
Civil QC inspector
Arzew, (Northern of Algeria)
Sonatrach GNL4 Gas Plant Renovating Project
• Inspected the Quality of the offshore LNG loading system concrete foundations works.
• Tested concrete in CTC laboratories. Identified , corrected, and prevented problems .
• Quantified & invoiced subcontractors works (blasting, painting and concrete Works).