Abdel malek Boudjemaa
Consultant control commande, Altran
Informatique , programation VBS,site Web
May 2005 to Today: Naftec Refinery – Oran Algeria
Zones 3 (5 units), 19 (5 units), 7(6 units) and 10(2 units)
>Engineering Phase 1 (Algiers – Algeria):
o Design of graphics, hardware & software configuration with control builder.
o Affectation and preparation of databases
>Engineering Phase 2 (Milan – Italy):
o Basic Engineering (data base & logics)
o Design and correction on customer’s PI&D
o Flashing & installing HART I/Os boards
o Stations & Servers (Flex & console R211) configuration and preparation for FAT
>Factory Acceptance Tests (Milan – Italy):
o Engage in meetings with customer to set up the test plan and assist him until the final approval.
>Hardware testing: I/O (analog/digital), Marshaling, Communication (internal and with ESD).
>Modifications on Control & Quick Builder on the request of customer
>Modifications on graphic pages on the request of the customer.
>SAT: Naftec Refinery (Oran - Algeria):
o Commissioning & loop testing (about 2000 loops)
o Assisting customer during the start-ups:
>Start-up of boilers through process control stabilization
>Operators coaching and teaching
>Some modifications on marshaling and networking
>Servers/Stations start-up and some last minute configuration changes.
April 2007: Train BP In-Amenas GNL plant’s operators (Brussels)
o Preparation of servers & stations
o Establish course goals (learning of navigation on station)
May 2006: Site survey of ENIP (petrochemical plant) (Skikda – Algeria)
o Inspection & Inventory assessment of the site.
Tonic Engineering Company (July 2003- May 2005):
1. BP GNL Plant (In-Amenas – Algeria
****Project Engineering :
Configuring a Honeywell FSC (logics, testing hardware, and communication with Honeywell Experion DCS) of Mega Train-II.
2. Fertalage Project (Petrochemical Plant)
****Engineering Design :
o Graphical pages on Honeywell Experion DCS
o Commissioning and instrumentation
o Consulting for custumer (ENIP skikda,naftec arzew).
Fabruary 2005 :Site survey of Fertial Anabaa – Algeria)
o Inspection & Inventory assessment of the site.
3. Algeria Paper Factory (P&P)
>Engineering Design :
o Configuration & Maintenance of a PLC (Siemens S7)
o IT maintenance (PC & network)
Training:
• R300 Experion PKS training
• Workshop: upgrade on Experion R210 control builder.
• Training on Honeywell EXPERION PKS on the station server and quick builder.
• EXPERION PKS control builder and HMIweb.
• Fails safe controller Configuring and Programming
• S5 Siemens Automat (configuration & programming).
2004 - 2005Projet Fertalge arzew algerie .
devellopement des logique DCS sur Experion PKS.
devellopement des pages Graphiques.
projet BP ain amnenass
devellopement de l'aplication ESD et F&G sur FSC
2003 - 2004maintenance des equipements instruments de mesure et de detection .
maintenance des automate siemens S7.